Project Details
Location: Central London
Scope: Refurbishment of Hybrid theatre
Unit: Hybrid Theatre
Technical Specification: To remove existing floor covering and all screeds. To prepare walls to a smooth surface finish and screed the floor area. To supply and fit Whiterock cladding to wall areas and Forbo safety flooring to a cap and cove finish to floor area.
Duration of project: 3 weeks